A lighted brick mailbox adds security and curb appeal to your home.
 |

 Enhance your home's curb appeal by building a brick mailbox. As a bonus, you'll be protecting your mailbox against vandalism.
|
|
Materials: Shovel Electrical cable rated for outdoor underground applications Masonry trowel Framing square Wheelbarrow Premixed mortar or a combination of equal portions of sand and Portland cement Level Measuring tape Work gloves Solid bricks Cored bricks Concrete blocks

 You can use a masonry chisel to cut bricks to shorter lengths.
| 
 For precise cuts, use a masonry blade on a circular saw.
|
- Remove your current mailbox, as well as all of the dirt from around the base of the post. Mailbox posts are often set in concrete, although yours may be attached to a metal stake, which makes it easier to remove. If your post is set in concrete, you'll probably need to remove all the concrete before pouring the footer for your brick mailbox.
 |

 Figure A
|
|  |

 Figure B
|
|  |

 Figure C
|
|
Dig a hole for your footer (figure A). Check local codes to determine the required depth for your footer. In most cases the footer should be at least 8" deep. Make the hole a few inches wider than the mailbox will be. Lay one end of underground outdoor electrical cable at the mailbox location. Leave enough slack for the cable to extend through the top of the mailbox to power your light fixture. Mix fast-drying concrete to create the mailbox footer. The concrete should have the consistency of oatmeal. After the concrete reaches the proper consistency, you'll have 45 minutes to work with it before it begins to set. Pour the concrete over the end of the electrical cable, and use the back of the shovel to smooth and level the concrete (figure B). You'll probably need more than one batch of concrete to fill the hole completely. While waiting for the concrete to dry, connect the cable to the main breaker box. Run a 12"-deep trench from the mailbox to the breaker box, and lay the wiring inside the trench (figure C). Hire a licensed electrician to connect the end of the cable to your main box.
 |

 Figure D
|
|  |

 Figure E
|
|  |

 Figure F
|
|
After the footing is dry, you can start laying the concrete-block foundation. Two 8" by 8" by 16" blocks work well. Use a trowel to mark reference points for the placement of the blocks. Mark the center reference point on the far end of the footer. Use a framing square to mark the outside edges and any other edges where blocks will rest. Mix equal portions of Portland cement, sand and water to the same consistency as the concrete for the footer, or use premixed mortar. Lay mortar along each line where the edge of a block will rest (figure D). Place plenty of mortar on each line. Lay a block on each line, and press it into place (figure E). Make sure there's enough mortar to support the block. Then lay another block beside the first one, using the same procedure. Begin a second run of blocks, making sure to keep your electrical cable accessible (figure F). Spread mortar along the edges of the first blocks, then set the next run of blocks on top of them. Stack the second run perpendicular to the first blocks.
Lay plenty of mortar along the footing where the first course of bricks will be placed (figure G). Lay the first brick in position, and press it gently into the mortar. You may need to adjust the placement of the bricks later. Apply mortar to one end of the next brick (figure H), and butt it against the first one (figure I).
 |

 Figure L
|
|  |

 Figure K
|
|  |

 Figure J
|
|
Continue placing bricks end to end. Occasionally check for level, and scrape off any excess mortar. Periodically check for square by measuring the distance of each brick from the block foundation. Adjust the placement of the bricks so that the measurement is equal on all sides. Work your way around the base until the course is done. Then use a framing square to make sure you're starting with a square base. For an interesting pattern variation, try a "soldier" course (bricks placed on end) for the fourth course of bricks (figure J). Start the course approximately 1/2" from the edge of the third row so that the edge of the underlying brick is exposed (this exposed brick is called a reveal). You can use cored bricks in the middle of the course, but the corner bricks should be solid. After the soldier course is set and before the mortar has dried, press a striking tool into the joints to create a depression in the mortar (figure K). This process is known as striking the joints. If you remove too much mortar, add more to the joint and smooth it out. Before beginning the next course, lay metal straps across the bricks and blocks to tie the remaining courses together (figure L).
Add another row of concrete blocks perpendicular to the row underneath (figure M). For the next course, return to the horizontal rows used earlier (figure N ). Continue with the horizontal course until you reach the area where you want to install the newspaper box. If you have extra bricks, use them as interior fill instead of concrete block to make a level platform for the newspaper box (figure O).
 |

 Figure P
|
|  |

 Figure Q
|
|  |

 Figure R
|
|
Add a large bed of mortar to secure the newspaper box (figure P). Treat the box as if it were a large brick. Use your level to angle the newspaper box slightly forward so it won't collect water. Install a soldier course on the front of the structure next to the newspaper box (figure Q). Continue installing horizontal courses on the sides and in the back. Before you begin laying bricks on top of the box, wedge some bricks in the front to prevent the top from sagging. Add two more horizontal courses to separate the mailbox from the newspaper box. After you reach the level where you want your mailbox, center the mailbox on the bricks, and move it around until the placement suits your taste. Allow sufficient clearance for the door to open (figure R). Mark the mailbox on either side to indicate the distance it will stick out of the brick structure.Remove the box, and lay a thick bed of mortar. Place the mailbox on top of the bricks, and press it into place. Install another soldier course next to the mailbox to mirror the one for the newspaper box. Then fill in the gaps around the mailbox with mortar. Install two more horizontal rows above the mailbox. Then extend the next course of bricks over the edge of the bricks below to create a reveal (figure S). Make sure the holes in the cored bricks are covered on the bottom and top.
"Step up" the remaining courses above the overhang, with each course closer to the center than the row below it (figure T).
Use solid bricks on top of the mailbox. This will protect the surface and provide a solid base for the light fixture. Make sure the bricks on top are level and that the electrical cable is in the center. Fill in the gaps with mortar. Wait a few hours for the mortar to dry, then use a stiff-bristle brush to remove loose particles from the mailbox. After two days the mortar will be dry enough for you to install the light fixture. Next: Fluorescent Bulb Lamp.
|